3n Consultancy Group
Powerplant+.jpg

Experience

Projects delivered with

professionalism, integrity and

ingenuity.

 

We’ve successfully completed a number of very involved energy infrastructure projects.

We are able to work alongside lead contractors or run the most advanced of projects with professionalism, integrity and ingenuity.


500kW STREETLIGHTING MICROGRID SOLUTION

Design, Construct and Commission an isolated micro grid solution comprising of 700 led lights, 300kW battery and 500kW solar array solution for a large power station complex in Bangladesh.

100MW HFO-BASED POWER PLANT DESIGN

Design services for civil works of the facilities and buildings for a 100MW HFO-Based Power Plant Project. The power plant included a range of services including land fill, embankment, internal roads, jetty, rain water drainage, electrical wiring, officer dormitory building, rest house, administration building & a complete guard house.

TRANSMISSION LINE DESIGN & DELIVERY

Design, supply, installation, testing & commissioning of 14.6km 132KV single circuit transmission line from a 100MW HFO-Based Power Plant to a 132KV Grid substation and bays extension at 132KV Grid substation on a turnkey basis.

SUBSTATION DESIGN & DELIVERY

Design, supply, installation, testing and commissioning of 33/11 KV, 2 x 16/20 MVA substations on a turnkey basis.

ELECTRICAL SERVICES & SYSTEMS

Design, supply, installation, testing and commissioning of electrical light & fittings, fire detection and alarm system and internet in the Administration Building at a 1320 MW Coal Fired Power Plant.

SUB-STATION EQUIPMENT SUPPLY & COMMISSIONING

Supply, installation, testing and commissioning of 1500 KVA substation equipment for 1000kv generation including cable to complete at a 1320 MW Coal Fired Power Plant.

SUPPLY OF 33KV & 11KV ACR CIRCUIT RECLOSER

Co-ordinate with the manufacturer of the ACR and master contractor, including preparation of the contract agreement between parties and organising an inspection of the manufacturer’s facilities.

SUPPLY & INSTALLATION OF IP CAMERA

Supply, erection and installation of IP Camera at 2x 660 MW Thermal Coal Base Power Plant.

COAL-DOME SOIL IMPROVEMENT & DEEP SOIL INVESTIGATION TO 36 METERS DEPTH AT COAL BASE POWER PLANT

Provision of labour, materials, plant and equipment including all necessary permits/approvals, safety measures, insurance etc for the plant and equipment required to carry out the works.